Nikhil Venkatesan
Majored in Industrial Engineering & Project Management, Minored in Quality Control
Rochester Institute of Technology, Class of 2016
From Guilderland, NY
Rochester Institute of Technology, Class of 2016
From Guilderland, NY
As a bold and analytical thinker, with a passion to fortify my skill in Manufacturing technologies and Statistical approach, coupled with a good working knowledge in the technical areas of Solidworks, Mastercam, Minitab and MS Office, I would like to be involved in implementing cutting edge technologies to make the industrial process more efficient, economical and the production place a safe work area.
Seeking a Fulltime Opportunity for an Manufacturing/Quality Engineer in a firm where I can get a platform to exhibit my skills and augment my knowledge.

Nikhil Venkatesan graduates from RIT
Nikhil Venkatesan graduated from RIT at the end of the fall 2016 semester with an ACT in project management . Congrats, Nikhil! Rochester Institute of Technology is home to leading creators, entre...
March, 28 2017 - Rochester Institute of Technology
Performance Excellence Specialist at Mallinckrodt Pharmaceuticals
• Create Standard Work for Start-up/Shutdown Process.
• Key member of the serialization project for all packaging lines dealing with over pack engineering studies, specifications and change controls.
• Using MS Access & SQL to update standards in BPCS.
• Implementing Leading2Lean in Manufacturing to collect & analyze KPI’s such as OEE, Shift Attainment & Downtime.
• Created & implemented weekly scorecard for entire Hobart site.
• Used A3 methodology to create goals and action items for FY 2017.
• Initiating SCRAP & SCAR project at Hobart site to incorporate governance system on quality of components used on the packaging floor.
• Performing 5s, lean & six sigma projects to improve the changeover process in Manufacturing.
• Investigate and monitor “Exceptions” data by performing Root Cause Analysis
• Training operators on the modified processes developed in these projects.
• Redesigning the process of OEE calculation for the Hobart Site
• Lean Leader training.
December 2016 - Present
Industrial/Supply Chain Engineer at Mallinckrodt Pharmaceuticals
• Six Sigma project focused on reducing the changeover times and improving productivity of the packaging lines.
• Project lead for the Shutdown/Start-up process of packaging lines resulting in cost savings of 250,000$ annually.
• Supply Chain project focused on determining the root cause of schedule changes in the plant and implement techniques to reduce its occurrence
• Managing reports from Leading2lean and performing data analysis in Excel to focus on the bottlenecks of the packaging lines.
• Use concepts of value stream mapping to find opportunities of improvement and report to the management
• Perform engineering studies on overpacks.
• Learning business planning and control system (BPCS) software to analyze planning and inventory management
• Act as liaison between planning, manufacturing, and Packaging divisions.
• Part of Leading2Lean transformation.
July 2016 - December 2016
Industrial/Supply Chain Engineer at C&S Wholesale Grocers
• Travelled 9 states and performed projects in 11 facilities and gained the experience of working in a union environment.
• Analyzed and formally presented data for solution of engineered labor standards issues.
• Performed a Six-Sigma (DMAIC) project on automated pallet wrapping machines, improving the productivity of the warehouse by a significant amount.
• Worked on a process improvement project focused on loading and provided valuable ideas currently being incorporated by the company.
• Completed couple of inbound-logistics projects and offered recommendations to the operations team to improve the efficiency of the process.
• Collaborated with supply chain analyst to understand the layout and the slotting of the warehouses and performed various experiments using excel to get optimum results.
February 2015 - August 2015
Lean Six Sigma Intern at Indian Railways
•Completed a lean six-sigma project on the layout and flow pattern of carriage workshops in southern railway department.
•Incorporated lean six sigma techniques like 5S, Kaizen under the PDCA framework.
•Performed Statistical Quality Control analysis on different processes in the carriage workshop.
December 2014 - February 2015